NASA has postponed for at least four days the debut test flight of its next-generation moon megarocket.
Technical problems scuppered the launch of the first rocket in NASA's Artemis project, a planned six-week uncrewed voyage around the moon and back 50 years after Apollo's last lunar mission.
The countdown clock was halted about 40 minutes before the targeted launch time of 8:33 am EDT (1233 GMT), as the 32-story-tall, two-stage Space Launch System (SLS) rocket and its Orion crew capsule awaited liftoff from the Kennedy Space Center in Cape Canaveral, Florida.
The US space agency cited a problem detected on one of the rocket's main engines, after launch teams had begun filling the rocket's core fuel tanks with super-cooled liquid oxygen and hydrogen propellants.
NASA did not give a new launch date but said its first available backup launch opportunity was set for Friday, September 2.
The launch of #Artemis I is no longer happening today as teams work through an issue with an engine bleed. Teams will continue to gather data, and we will keep you posted on the timing of the next launch attempt. https://t.co/tQ0lp6Ruhv pic.twitter.com/u6Uiim2mom
— NASA (@NASA) August 29, 2022


Russian attack on Ukraine's Dymer in Kyiv region kills 11, official says
Schools across Germany, Denmark receive bomb threats
India finds sample of popular Bisleri water unsafe, to widen checks to all brands
South Korea's education minister quits over exam cheating chaos
COP31 climate talks break down as EU, others reject deal
Indonesia factory fire search to resume Monday as 24 body bags recovered
Libya suspects drone attack caused Benghazi ship explosion
India food regulator to take Bisleri to court over unsafe water sample
